Below are a few pictures of what we've been up to. The first shot is a look at a half finished kitchen. The base cabinets are all installed and the countertops have been measured and will be put in this Friday. This week my contractor should have the remaining top cabinets installed. We have run into a few problems, and I've documented those for you as well. Enjoy!


Half & Half


The Infamous Slant Route: The ceilings are...surprise!...not level across. There is more of a slow decline from one side to the other, resulting in a large gap between the cabinets, ceiling and molding. We have decided to put on a kind of "extension" to the cabinet with some filler materials- that way, it will be mostly covered by the molding but should not show any gaping holes/gaps. A good, but complex fix. You can see a small piece above the cabinet here. Note: in this example, the molding will cover the whole thing, so we didn't have to use filler material. The problem is in the top cabinets over the dishwasher.


Hit me in the box! This wonderfully placed electrical box is, surprise!...in the way. So, we're going to have to move it down...more problems...I smell them.



A Kinder Cinder? No. To remove said electrical box down, we (I mean, the contractor) have to use a hammer-drill to chip it out and then place a second box underneath it and pigtail from the one above it. This little side project should all hopefully be done by tomorrow. We'll see. Have a great day- we're hoping and praying for a snow day! We're looking at anywhere from 5 to 9 inches. Yay! Thanks for the pics Mom/Dad and Les!

2 comments:

  1. Home improvement...looks like fun! Leslie

    ReplyDelete
  2. Thanks for passing some pics along. I have been thinking of you guys and praying that all goes well and is hopefully completed by this weekend. You have waited a long time to get settled in your kitchen- a room that is pretty necessary. Bless Saint Heather's heart! Love ya, MOM

    ReplyDelete